Project Overview

This $13 million KYTC project will build new RCUTs (restricted crossing U-turns) along Richmond Road (U.S. 25) and Athens-Boonesboro Road (KY 418) south of Man O’ War Boulevard in Lexington – a proven design that reduces crashes and enhances traffic flow. Improvements over the next year will include:

  • Safer intersections at Yorkshire and Squires, Ellerslie Park Boulevard and Jacobson Park, Hays Boulevard, Brenda Cowan Elementary, and more
  • Reduced conflict points, and less traffic delay on Richmond Road, Athens-Boonesboro and side roads
  • A new shared use path, new and improved Jacobson Park entrance, and a better U.S. 25 (Old Richmond Road) intersection

Project Updates

Construction Phase Information

Construct the outside full depth lanes and shoulders of Richmond Road and Athens-Boonesboro Road (US 25 / KY 418).

  • Short term lane closures may occur as needed for the outside lane from 9 AM to 4 PM.
  • Construction of a new section of US 25 along Aphids Way will be completed in Phases 1 & 2. Aphids Way will be closed to traffic during construction and traffic should use Old Richmond Road.
Construction Map
Phase One graphic
Click to enlarge

Construction in the median of Richmond Road and Athens-Boonesboro Road (US 25 / KY 418).

  • Construct the median islands for the U-turn crossovers and left turn lanes to provide U-turn access to side roads.
  • Short term lane closures may occur as needed for the outside lane from 9 AM to 4 PM.
  • Construction of a new section of US 25 along Aphids Way will be completed in Phases 1 & 2. Aphids Way will be closed to traffic during construction and traffic should use Old Richmond Road.
Construction Map
Phase two graphic
Click to enlarge

Construction in the median of Richmond Road and Athens-Boonesboro Road (US 25 / KY 418).

  • Construct the median islands in the intersection to provide RCUT access to the side roads. Left turns at the intersection shall be restricted and drivers may make U-turns at the crossovers.
  • Traffic from the side streets turning left or going through may turn right and use the newly constructed U-turns.
Construction Map
Phase three graphic
Click to enlarge
Phase three top-down graphic
Click to enlarge

Once left turn and through movements from the side roads are restricted (starting in Phase 3), traffic should follow the RCUT flow of traffic shown on the right. See KYTC’s SAFERoad Solutions page for more information about RCUTs.

Perform final blacktop surfacing for the entire project after widening has been completed.

Final phase top-down graphic
Click to enlarge

Interactive Map

Proposed roadway improvements shown, as well as previously constructed RCUT at Competition Drive near I-75.

Legend

Raised Island
New Shared Use Path
Grass Median
Pavement Removal

Our Guide to RCUTS

Project Timeline

Project timline: March 30, 2022
                                        Public Notice of Project; April 1, 2023
                                        ROW Acquisition Began; May 1, 2024
                                        Intersection at Competition Drive Construction Began; Intersection at Competition Drive Construction Completed;
                                        April 20, 2025 Final Construction Plans Complete
                                        July 1, 2025* Phase 1 Construction to Begin;
                                        TBD Phase 2 Construction Estimated to Begin;
                                        TBD Phase 3 Construction Estimated to Begin'
                                        June 30, 2026* Construction Completed
Click to enlarge